BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Bed and Ways

Assembly

Precision-ground cast-iron bed with accurately aligned V and flat ways for the carriage. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Bed and Ways parts and their functions

5 top-level parts · 5 parts in total · full bill of materials below
Bed and Ways parts diagram: 1 bed casting, 2 carriage, 3 cross-slide, 4 compound slide, 5 gibs and slides. 5 parts in 5 top-level items.
Bed and Ways parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Bed Casting 1× Heavy cast-iron beam with ways ground to 0.0005 inch
2 Carriage 1× Sliding block with cross-slide and compound
3 Cross-Slide 1× Perpendicular feed mechanism with handwheel
4 Compound Slide 1× Angled slide for taper turning and threading
5 Gibs and Slides 1× Precision gibs keeping carriage centered on ways

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Bed and Ways

5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Bed Casting watchmaker-lathe-bed-casting 1× 1 · part
2 Carriage watchmaker-lathe-carriage 1× 1 · part
3 Cross-Slide watchmaker-lathe-cross-slide 1× 1 · part
4 Compound Slide watchmaker-lathe-compound-slide 1× 1 · part
5 Gibs and Slides watchmaker-lathe-gibs-and-slides 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the bed and ways is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks