BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Catcher Tank and Table

Assembly

The water-filled steel tank that stops the spent jet and the slat grid that supports the workpiece. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Catcher Tank and Table parts and their functions

5 top-level parts · 34 parts in total · full bill of materials below
Catcher Tank and Table parts diagram: 1 catcher tank, 2 support slat, 3 slat frame, 4 drain and overflow, 5 sludge removal. 34 parts in 5 top-level items.
Catcher Tank and Table parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Catcher Tank 1× Steel catcher tank
2 Support Slat 30× Support slats
3 Slat Frame 1× Slat support frame
4 Drain and Overflow 1× Tank drain and overflow
5 Sludge Removal 1× Spent-abrasive removal

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Catcher Tank and Table

5 top-level lines · 5 rows shown · 34 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Catcher Tank waterjet-cutting-machine-tank 1× 1 · part
2 Support Slat waterjet-cutting-machine-slat 30× 30 · part
3 Slat Frame waterjet-cutting-machine-slat-frame 1× 1 · part
4 Drain and Overflow waterjet-cutting-machine-drain 1× 1 · part
5 Sludge Removal waterjet-cutting-machine-sludge-removal 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the catcher tank and table is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks