Blast Chamber
AssemblyEnclosed cabinet lined with manganese-steel wear plates, containing the blast zone and impact surfaces. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Blast Chamber parts and their functions
5 top-level parts · 5 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Chamber Steel Frame | 1× | Structural steel box (welded, ~2.5 m³ internal) |
| 2 | Manganese-Steel Floor | 1× | Manganese-steel floor (20 mm thick) absorbing impact |
| 3 | Steel Wear Backing Plates | 1× | Hardened-steel backing plates protecting structure |
| 4 | Access Door with Seal | 1× | Large hinged door for part loading/unloading |
| 5 | Observation Window | 1× | Thick glass porthole monitoring blast progress |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Blast Chamber
5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Chamber Steel Frame | wheel-shot-blast-machine-chamber-frame | 1× | 1 | · | part |
| 2 | Manganese-Steel Floor | wheel-shot-blast-machine-wear-plate-floor | 1× | 1 | · | part |
| 3 | Steel Wear Backing Plates | wheel-shot-blast-machine-wear-plate-walls | 1× | 1 | · | part |
| 4 | Access Door with Seal | wheel-shot-blast-machine-access-door | 1× | 1 | · | part |
| 5 | Observation Window | wheel-shot-blast-machine-viewing-window | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the blast chamber is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |