BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Process Water & Compound System

Assembly

Meters water and liquid compound into the bowl to flush fines, lubricate the cut and stop parts staining; spent water drains off to a settling tank. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Process Water & Compound System parts and their functions

6 top-level parts · 31 parts in total · full bill of materials below
Process Water & Compound System parts diagram: 1 water inlet valve, 2 compound dosing pump, 3 compound tank, 4 water flow meter, 5 settling tank, 6 fluid hose. 31 parts in 6 top-level items.
Process Water & Compound System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Water Inlet Valve 1× Water inlet valve
2 Compound Dosing Pump 3 parts 1× Compound dosing pump
3 Compound Tank 1× Compound tank
4 Water Flow Meter 1× Water flow meter
5 Settling Tank 1× Settling tank
6 Fluid Hose 4× Fluid hoses

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Process Water & Compound System

6 top-level lines · 16 rows shown · 31 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Water Inlet Valve deburring-tumbler-water-valve 1× 1 · part
2 Compound Dosing Pump 3 parts deburring-tumbler-dosing-pump 1× 1 23 assembly
2.1 Stator Assembly 3 parts stator-assembly 1× 1 3 assembly
2.1.1 Stator Core (laminations) stator-core 1× 1 · part
2.1.2 Copper Winding copper-winding 1× 1 · part
2.1.3 Slot Insulation stator-insulation 1× 1 · part
2.2 Rotor Assembly 4 parts rotor-assembly 1× 1 19 assembly
2.2.1 Rotor Shaft rotor-shaft 1× 1 · part
2.2.2 Rotor Core rotor-core 1× 1 · part
2.2.3 Neodymium Magnet neodymium-magnet 16× 16 · part
2.2.4 Ball Bearing ball-bearing 1× 1 · part
2.3 Pump Tube deburring-tumbler-pump-tube 1× 1 · part
3 Compound Tank deburring-tumbler-compound-tank 1× 1 · part
4 Water Flow Meter deburring-tumbler-flow-meter 1× 1 · part
5 Settling Tank deburring-tumbler-settling-tank 1× 1 · part
6 Fluid Hose deburring-tumbler-fluid-hose 4× 4 · part

Something wrong in this list? Report a problem with this BOM.

Where the process water & compound system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks