Process Water & Compound System
AssemblyMeters water and liquid compound into the bowl to flush fines, lubricate the cut and stop parts staining; spent water drains off to a settling tank. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Process Water & Compound System
6 top-level lines as of r42957| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Water Inlet Valve | deburring-tumbler-water-valve | 1× | 1 | · | part |
| 2 | Compound Dosing Pump 3 parts | deburring-tumbler-dosing-pump | 1× | 1 | 0 | assembly |
| 3 | Compound Tank | deburring-tumbler-compound-tank | 1× | 1 | · | part |
| 4 | Water Flow Meter | deburring-tumbler-flow-meter | 1× | 1 | · | part |
| 5 | Settling Tank | deburring-tumbler-settling-tank | 1× | 1 | · | part |
| 6 | Fluid Hose | deburring-tumbler-fluid-hose | 4× | 4 | · | part |