BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items

You are viewing r42957 of this page, not the current version. Go to current · history

Process Water & Compound System

Assembly

Meters water and liquid compound into the bowl to flush fines, lubricate the cut and stop parts staining; spent water drains off to a settling tank. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Bill of materials for Process Water & Compound System

6 top-level lines as of r42957
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Water Inlet Valve deburring-tumbler-water-valve 1× 1 · part
2 Compound Dosing Pump 3 parts deburring-tumbler-dosing-pump 1× 1 0 assembly
3 Compound Tank deburring-tumbler-compound-tank 1× 1 · part
4 Water Flow Meter deburring-tumbler-flow-meter 1× 1 · part
5 Settling Tank deburring-tumbler-settling-tank 1× 1 · part
6 Fluid Hose deburring-tumbler-fluid-hose 4× 4 · part