Table and Saddle
AssemblyThe T-slotted worktable moves longitudinally (X) on the saddle, which moves crosswise (Y) on the knee. Together with the knee elevation this gives the operator three hand-cranked axes of movement around a fixed cutter. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Table and Saddle parts and their functions
8 top-level parts · 16 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Worktable | 1× | T-slotted worktable |
| 2 | Saddle | 1× | Cross saddle |
| 3 | Table Lead Screw | 1× | Longitudinal lead screw |
| 4 | Cross Lead Screw | 1× | Cross lead screw |
| 5 | Table Way | 2× | Table dovetail ways |
| 6 | Table Stop | 2× | Adjustable travel stops |
| 7 | Way Wiper | 4× | Felt way wipers |
| 8 | Ball Bearing | 4× | Lead screw bearings |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Table and Saddle
8 top-level lines · 8 rows shown · 16 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Worktable | km-worktable | 1× | 1 | · | part |
| 2 | Saddle | km-saddle | 1× | 1 | · | part |
| 3 | Table Lead Screw | km-table-screw | 1× | 1 | · | part |
| 4 | Cross Lead Screw | km-cross-screw | 1× | 1 | · | part |
| 5 | Table Way | km-table-way | 2× | 2 | · | part |
| 6 | Table Stop | km-table-stop | 2× | 2 | · | part |
| 7 | Way Wiper | km-way-wiper | 4× | 4 | · | part |
| 8 | Ball Bearing | ball-bearing | 4× | 4 | · | part |
Where the table and saddle is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $20–$800. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatseats.com ↗ | Gurugram, IN | Seating systems | 500 sets | 8–12 wks |
|
🇨🇳Yanfeng
yanfeng.com ↗
|
Shanghai, CN | Interiors & seating | 500 sets | 8–12 wks |
| haritaseating.com ↗ | Chennai, IN | Seating systems | 500 sets | 8–12 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 sets | 8–12 wks |
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 500 sets | 8–12 wks |