BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Tube Clamp & Chuck

Assembly

Motorized collet chuck gripping the tube and optionally rotating it during welding. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Tube Clamp & Chuck parts and their functions

5 top-level parts · 6 parts in total · full bill of materials below
Tube Clamp & Chuck parts diagram: 1 chuck housing, 2 chuck collet, 3 chuck rotation motor, 4 ball bearing, 5 pneumatic cylinder. 6 parts in 5 top-level items.
Tube Clamp & Chuck parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Chuck Housing 1× Precision-machined body accepting collets for 6–50 mm OD tube.
2 Chuck Collet 1× Expandable collet for tube OD
3 Chuck Rotation Motor 1× Optional rotation motor
4 Ball Bearing 2× Chuck rotation bearing
5 Pneumatic Cylinder 1× Collet clamp actuator

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Tube Clamp & Chuck

5 top-level lines · 5 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Chuck Housing orbital-welding-machine-chuck-body 1× 1 · part
2 Chuck Collet orbital-welding-machine-chuck-collet 1× 1 · part
3 Chuck Rotation Motor orbital-welding-machine-chuck-motor 1× 1 · part
4 Ball Bearing ball-bearing 2× 2 · part
5 Pneumatic Cylinder pneumatic-cylinder 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the tube clamp & chuck is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks