BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Entry Section

Assembly

The roller table and pinch rolls that catch the hot tube from the upstream mill and push it into the first sizing stand. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Entry Section parts and their functions

6 top-level parts · 29 parts in total · full bill of materials below
Entry Section parts diagram: 1 entry table roller, 2 pinch roll, 3 side guide, 4 entry trough, 5 roller drive motor, 6 ball bearing. 29 parts in 6 top-level items.
Entry Section parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Entry Table Roller 6× Driven table rollers
2 Pinch Roll 2× Pinch rolls
3 Side Guide 2× Side guides
4 Entry Trough 1× Entry guide trough
5 Roller Drive Motor 6× Roller drive motors
6 Ball Bearing 12× Roller bearings

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Entry Section

6 top-level lines · 6 rows shown · 29 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Entry Table Roller pipe-sizing-mill-entry-roller 6× 6 · part
2 Pinch Roll pipe-sizing-mill-pinch-roll 2× 2 · part
3 Side Guide pipe-sizing-mill-side-guide 2× 2 · part
4 Entry Trough pipe-sizing-mill-entry-trough 1× 1 · part
5 Roller Drive Motor pipe-sizing-mill-roller-motor 6× 6 · part
6 Ball Bearing ball-bearing 12× 12 · part

Something wrong in this list? Report a problem with this BOM.

Where the entry section is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks