BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Lower Work Roll Bank

Assembly

Fixed lower row of work rolls staggered against the upper bank so the strip is bent in alternating directions as it passes. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Lower Work Roll Bank parts and their functions

3 top-level parts · 54 parts in total · full bill of materials below
Lower Work Roll Bank parts diagram: 1 leveling work roll, 2 roll journal block, 3 oil seal. 54 parts in 3 top-level items.
Lower Work Roll Bank parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Leveling Work Roll 6× Hardened small-diameter work rolls
2 Roll Journal Block 3 parts 12× Journal blocks carrying the work rolls
3 Oil Seal 12× Journal seals

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Lower Work Roll Bank

3 top-level lines · 6 rows shown · 54 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Leveling Work Roll roller-leveler-work-roll 6× 6 · part
2 Roll Journal Block 3 parts roller-leveler-roll-journal-block 12× 12 3 assembly
2.1 Ball Bearing ball-bearing 1× 12 · part
2.2 Oil Seal oil-seal 1× 12 · part
2.3 Fastener Set fastener-set 1× 12 · part
3 Oil Seal oil-seal 12× 12 · part

Something wrong in this list? Report a problem with this BOM.

Where the lower work roll bank is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks