Work Support
AssemblyHolds and locates the shaft during rolling, either between centers or in a chuck, and keeps it from deflecting under the radial die forces. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Work Support parts and their functions
7 top-level parts · 11 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Headstock | 1× | Headstock |
| 2 | Tailstock | 1× | Tailstock |
| 3 | Live Center | 2× | Live centers |
| 4 | Steady Rest | 1× | Steady rest |
| 5 | Work Chuck | 1× | Work chuck option |
| 6 | Loader Interface | 1× | Part load/unload interface |
| 7 | Ball Bearing | 4× | Center and spindle bearings |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Work Support
7 top-level lines · 7 rows shown · 11 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Headstock | spline-rolling-machine-headstock | 1× | 1 | · | part |
| 2 | Tailstock | spline-rolling-machine-tailstock | 1× | 1 | · | part |
| 3 | Live Center | spline-rolling-machine-live-center | 2× | 2 | · | part |
| 4 | Steady Rest | spline-rolling-machine-steady-rest | 1× | 1 | · | part |
| 5 | Work Chuck | spline-rolling-machine-chuck | 1× | 1 | · | part |
| 6 | Loader Interface | spline-rolling-machine-loader | 1× | 1 | · | part |
| 7 | Ball Bearing | ball-bearing | 4× | 4 | · | part |
Where the work support is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |