BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Robot Arm or Gantry

Assembly

Industrial articulated robot (6–9 axes) or XYZ gantry system providing precise end-effector positioning and orientation over part surface. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Robot Arm or Gantry parts and their functions

5 top-level parts · 15 parts in total · full bill of materials below
Robot Arm or Gantry parts diagram: 1 robot base, 2 robot joint, 3 wrist assembly, 4 robot controller, 5 servo drive. 15 parts in 5 top-level items.
Robot Arm or Gantry parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Robot Base 1× Floor or pedestal mount
2 Robot Joint 6× Servo-driven articulations
3 Wrist Assembly 1× Tool orientation (roll, pitch, yaw)
4 Robot Controller 1× Motion control module
5 Servo Drive 6× Joint power amplifiers

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Robot Arm or Gantry

5 top-level lines · 5 rows shown · 15 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Robot Base automated-fiber-placement-robot-base 1× 1 · part
2 Robot Joint automated-fiber-placement-robot-joints 6× 6 · part
3 Wrist Assembly automated-fiber-placement-robot-wrist 1× 1 · part
4 Robot Controller automated-fiber-placement-robot-controller 1× 1 · part
5 Servo Drive automated-fiber-placement-servo-drives 6× 6 · part

Something wrong in this list? Report a problem with this BOM.

Where the robot arm or gantry is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks