BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Booth Enclosure

Assembly

Sealed walls, roof, and floor containing powder overspray and directing airflow. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Booth Enclosure parts and their functions

5 top-level parts · 6 parts in total · full bill of materials below
Booth Enclosure parts diagram: 1 side panel, 2 roof panel, 3 exhaust duct, 4 intake pre-filter, 5 drain tray. 6 parts in 5 top-level items.
Booth Enclosure parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Side Panel 2× Aluminum frame with polycarbonate
2 Roof Panel 1× Removable roof panel for access
3 Exhaust Duct 1× Main exhaust inlet duct
4 Intake Pre-filter 1× Pre-filter on fresh air intake
5 Drain Tray 1× Stainless floor tray for powder collection

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Booth Enclosure

5 top-level lines · 5 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Side Panel batch-powder-booth-side-panels 2× 2 · part
2 Roof Panel batch-powder-booth-roof-panel 1× 1 · part
3 Exhaust Duct batch-powder-booth-exhaust-duct 1× 1 · part
4 Intake Pre-filter batch-powder-booth-intake-filter 1× 1 · part
5 Drain Tray batch-powder-booth-drain-tray 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the booth enclosure is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks