BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Telescoping Boom Arm

Assembly

Hydraulic or manual telescoping boom (2–3 m extended length) with articulated joint at base enabling height and reach adjustment. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Telescoping Boom Arm parts and their functions

4 top-level parts · 4 parts in total · full bill of materials below
Telescoping Boom Arm parts diagram: 1 boom Raise/Lower cylinder, 2 boom structural tube, 3 boom base pivot joint, 4 armored hydraulic hose. 4 parts in 4 top-level items.
Telescoping Boom Arm parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Boom Raise/Lower Cylinder 1× Double-acting hydraulic cylinder (bore 80 mm, stroke 1000 mm) raising/lowering boom
2 Boom Structural Tube 1× Steel or aluminum box-tube boom (100 × 100 mm, 3 mm wall, nested sections)
3 Boom Base Pivot Joint 1× Heavy-duty ball bearing pivot at boom base, allowing 180° rotation
4 Armored Hydraulic Hose 1× Armored hydraulic hose routing pressure and return lines to boom cylinder

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Telescoping Boom Arm

4 top-level lines · 4 rows shown · 4 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Boom Raise/Lower Cylinder burial-vault-lift-boom-cylinder 1× 1 · part
2 Boom Structural Tube burial-vault-lift-boom-tube 1× 1 · part
3 Boom Base Pivot Joint burial-vault-lift-boom-pivot 1× 1 · part
4 Armored Hydraulic Hose burial-vault-lift-boom-hose 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the telescoping boom arm is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $1–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳JLCPCB
jlcpcb.com ↗
Shenzhen, CN PCB fabrication 100 pcs 2–4 wks
🇨🇳PCBWay
pcbway.com ↗
Shenzhen, CN PCB fab & assembly 100 pcs 2–4 wks
scc.com.cn ↗ Shenzhen, CN PCB manufacturer 100 pcs 2–4 wks
shogini.com ↗ Mumbai, IN PCB manufacturer 100 pcs 2–4 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 100 pcs 2–4 wks