Cable Spool & Drum Assembly
AssemblySteel drum with stainless cable wound, capacity 2000+ kg; cable passes through load cell for weight monitoring. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Cable Spool & Drum Assembly parts and their functions
4 top-level parts · 4 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Cable Drum Assembly | 1× | Steel drum hub and shell (300 mm diameter, 200 mm width) with flange |
| 2 | Wire Rope Cable | 1× | Stainless steel wire rope (8–10 mm diameter, 6 × 37 construction, 2500 kg min breaking) |
| 3 | Cable Routing Pulley | 1× | Pulley or sheave at boom tip guiding cable downward to load |
| 4 | Drum Brake Tension Control | 1× | Drum brake or dynamic tension adjuster preventing cable slack or over-spool |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Cable Spool & Drum Assembly
4 top-level lines · 4 rows shown · 4 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Cable Drum Assembly | burial-vault-lift-drum-hub | 1× | 1 | · | part |
| 2 | Wire Rope Cable | burial-vault-lift-cable | 1× | 1 | · | part |
| 3 | Cable Routing Pulley | burial-vault-lift-cable-guide | 1× | 1 | · | part |
| 4 | Drum Brake Tension Control | burial-vault-lift-cable-adjuster | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the cable spool & drum assembly is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.10–$30. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| motherson.com ↗ | Noida, IN | Wiring harness & modules | 1,000 sets | 4–6 wks |
|
🇮🇳Polycab
polycab.com ↗
|
Mumbai, IN | Wires & cables | 1,000 sets | 4–6 wks |
|
🇨🇳Luxshare
luxshare-ict.com ↗
|
Dongguan, CN | Connectors & cables | 1,000 sets | 4–6 wks |
|
🇨🇳Hengtong
hengtonggroup.com ↗
|
Suzhou, CN | Cables | 1,000 sets | 4–6 wks |
|
🇮🇳Finolex
finolex.com ↗
|
Pune, IN | Wires & cables | 1,000 sets | 4–6 wks |