Burner System
AssemblyNatural gas or oil burner(s) with fuel valve control, air mixing, and ignition, rated for the kiln's thermal load. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Burner System parts and their functions
6 top-level parts · 6 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Main Burner | 1× | High-capacity gas or oil burner, 50–500 kW |
| 2 | Pilot Burner | 1× | Ignition burner with safety control |
| 3 | Fuel Valve | 1× | On/off fuel shutoff valve |
| 4 | Proportional Valve | 1× | Modulating valve for burner power control |
| 5 | Air Blower | 1× | Combustion air supply with damper |
| 6 | Ignition Electrode | 1× | Spark plug or glow plug for ignition |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Burner System
6 top-level lines · 6 rows shown · 6 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Main Burner | ceramic-kiln-main-burner | 1× | 1 | · | part |
| 2 | Pilot Burner | ceramic-kiln-pilot-burner | 1× | 1 | · | part |
| 3 | Fuel Valve | ceramic-kiln-fuel-valve-solenoid | 1× | 1 | · | part |
| 4 | Proportional Valve | ceramic-kiln-proportional-fuel-valve | 1× | 1 | · | part |
| 5 | Air Blower | ceramic-kiln-air-blower | 1× | 1 | · | part |
| 6 | Ignition Electrode | ceramic-kiln-ignition-electrode | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the burner system is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |