Paint Supply and Color-Change System

Assembly

Pumps, circulation loops and valve stacks delivering paint and switching colors at the atomizer. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Bill of materials for Paint Supply and Color-Change System

5 top-level lines as of r37629
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Circulation Pump conveyor-paint-booth-circulation-pump 2× 2 · part
2 Color-Change Valve Stack 4 parts conveyor-paint-booth-color-change-stack 6× 6 0 assembly
3 Fluid Regulator conveyor-paint-booth-fluid-regulator 6× 6 · part
4 Flow Meter conveyor-paint-booth-flow-meter 6× 6 · part
5 Solvent Flush Valve conveyor-paint-booth-solvent-flush-valve 6× 6 · part