Control System
AssemblyPLC monitors moisture, temperature, line speed, and pressure; coordinates all motors and heaters. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Control System parts and their functions
4 top-level parts · 4 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Main Drive Motor | 1× | 50–150 kW primary drive; VFD for speed ramp-up |
| 2 | Corrugator PLC | 1× | Siemens S7-1500 or Beckhoff TwinCAT with recipe storage |
| 3 | HMI Console | 1× | 15 inch touchscreen HMI with diagnostics and production counter |
| 4 | Steam Supply | 1× | 0.6 MPa steam for moisture conditioning before corrugating |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Control System
4 top-level lines · 4 rows shown · 4 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Main Drive Motor | corrugator-line-main-motor | 1× | 1 | · | part |
| 2 | Corrugator PLC | corrugator-line-plc | 1× | 1 | · | part |
| 3 | HMI Console | corrugator-line-hmi-console | 1× | 1 | · | part |
| 4 | Steam Supply | corrugator-line-steam-system | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the control system is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |