Double Backer Section

Assembly

Second glue unit and corrugating roll pair bond second linerboard to the single-faced sheet, completing corrugated structure. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Double Backer Section parts and their functions

4 top-level parts · 6 parts in total · full bill of materials below
Double Backer Section parts diagram: 1 back liner inlet, 2 double glue applicator, 3 double backer roll, 4 pressure comber. 6 parts in 4 top-level items.
Double Backer Section parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Back Liner Inlet 1× Feeds back linerboard sheet
2 Double Glue Applicator 1× Applies adhesive to back medium flanks
3 Double Backer Roll 2× Second pair corrugating rolls mirrors first facer layout
4 Pressure Comber 2× Provides final consolidation and air removal

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Double Backer Section

4 top-level lines · 4 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Back Liner Inlet corrugator-line-second-liner-inlet 1× 1 · part
2 Double Glue Applicator corrugator-line-double-glue-applicator 1× 1 · part
3 Double Backer Roll corrugator-line-double-backing-roll 2× 2 · part
4 Pressure Comber corrugator-line-pressure-rolls 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the double backer section is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks