BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Charging System

Assembly

Automated skip hoist and bell-type charging valves metering metal and coke into the furnace. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Charging System parts and their functions

5 top-level parts · 5 parts in total · full bill of materials below
Charging System parts diagram: 1 charging door, 2 skip hoist motor and drum, 3 charging bucket, 4 primary charging bell valve, 5 secondary bell and drip spout. 5 parts in 5 top-level items.
Charging System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Charging Door 1× Large hinged opening with asbestos lining
2 Skip Hoist Motor and Drum 1× Electric hoist lifting 50 kg charge bucket
3 Charging Bucket 1× Steel bucket holding metal + coke mixture
4 Primary Charging Bell Valve 1× Primary gate valve (large bore)
5 Secondary Bell and Drip Spout 1× Secondary bell for drip spout opening

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Charging System

5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Charging Door cupola-furnace-charging-door 1× 1 · part
2 Skip Hoist Motor and Drum cupola-furnace-skip-hoist 1× 1 · part
3 Charging Bucket cupola-furnace-charge-bucket 1× 1 · part
4 Primary Charging Bell Valve cupola-furnace-bell-valve-top 1× 1 · part
5 Secondary Bell and Drip Spout cupola-furnace-secondary-bell 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the charging system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks