BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Fiber Creel & Tensioning

Assembly

Multi-spool carousel holding roving reels, with load-cell tension control per tow. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Fiber Creel & Tensioning parts and their functions

4 top-level parts · 23 parts in total · full bill of materials below
Fiber Creel & Tensioning parts diagram: 1 creel frame, 2 spool bearing, 3 tension block, 4 guide eye. 23 parts in 4 top-level items.
Fiber Creel & Tensioning parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Creel Frame 1× Multi-level frame
2 Spool Bearing 8× Roving spool cradles
3 Tension Block 8× Load cell and servo brake per roving
4 Guide Eye 6× Roving divergence

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Fiber Creel & Tensioning

4 top-level lines · 4 rows shown · 23 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Creel Frame fiberglass-pipe-machine-creel-structure 1× 1 · part
2 Spool Bearing fiberglass-pipe-machine-spool-bearing 8× 8 · part
3 Tension Block fiberglass-pipe-machine-tension-block 8× 8 · part
4 Guide Eye fiberglass-pipe-machine-guide-eye 6× 6 · part

Something wrong in this list? Report a problem with this BOM.

Where the fiber creel & tensioning is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks