BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Product Bowl Assembly

Assembly

Stainless steel perforated chamber holds powder, maintains steady-state fluidization at 5–20 cm/s linear velocity. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Product Bowl Assembly parts and their functions

6 top-level parts · 7 parts in total · full bill of materials below
Product Bowl Assembly parts diagram: 1 bowl shell, 2 air distributor plate, 3 thermal jacket, 4 overflow dam, 5 discharge valve, 6 fastener set. 7 parts in 6 top-level items.
Product Bowl Assembly parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Bowl Shell 1× Stainless 316L perforated bottom and cylindrical wall
2 Air Distributor Plate 1× Sintered stainless steel or fabric distributor plate
3 Thermal Jacket 1× Optional thermal jacket regulates bowl wall temperature
4 Overflow Dam 1× Controls product level prevents overflow into exhaust
5 Discharge Valve 1× Pneumatic butterfly valve for batch discharge
6 Fastener Set 2× Bowl mounting and seal connection points

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Product Bowl Assembly

6 top-level lines · 6 rows shown · 7 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Bowl Shell fluid-bed-bowl-shell 1× 1 · part
2 Air Distributor Plate fluid-bed-bowl-perforated-plate 1× 1 · part
3 Thermal Jacket fluid-bed-bowl-jacket 1× 1 · part
4 Overflow Dam fluid-bed-overflow-dam 1× 1 · part
5 Discharge Valve fluid-bed-discharge-valve 1× 1 · part
6 Fastener Set fastener-set 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the product bowl assembly is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks