Ladle Support Stand
AssemblyWelded steel framework providing stable resting position for ladle during fill and heat soak. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Ladle Support Stand parts and their functions
5 top-level parts · 8 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Stand Base Frame | 1× | Steel fabricated H-frame base (1.5 m × 1.2 m) |
| 2 | Stand Center Pedestal | 1× | Central steel column supporting ladle nest |
| 3 | Ladle Nest Ring | 1× | Steel ring (outer bore matched to ladle OD) |
| 4 | Spout Support Bracket | 1× | Adjustable steel bracket holding spout at pouring height |
| 5 | Stand Caster Wheel | 4× | Casters (rated 10 tons each) for positioning |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Ladle Support Stand
5 top-level lines · 5 rows shown · 8 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Stand Base Frame | geared-foundry-ladle-stand-base | 1× | 1 | · | part |
| 2 | Stand Center Pedestal | geared-foundry-ladle-stand-pedestal | 1× | 1 | · | part |
| 3 | Ladle Nest Ring | geared-foundry-ladle-nest-ring | 1× | 1 | · | part |
| 4 | Spout Support Bracket | geared-foundry-ladle-spout-support | 1× | 1 | · | part |
| 5 | Stand Caster Wheel | geared-foundry-ladle-stand-wheels | 4× | 4 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the ladle support stand is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |