BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Take-Out Mechanism

Assembly

Automated pusher or gripper arm that removes finished hot containers from blow mold cavities and transfers to discharge conveyor. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Take-Out Mechanism parts and their functions

4 top-level parts · 4 parts in total · full bill of materials below
Take-Out Mechanism parts diagram: 1 take-out arm, 2 gripper fingers, 3 discharge conveyor, 4 arm solenoid. 4 parts in 4 top-level items.
Take-Out Mechanism parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Take-Out Arm 1× Pneumatic or servo-driven pusher
2 Gripper Fingers 1× Heat-resistant contact pads
3 Discharge Conveyor 1× Transport to annealing lehr
4 Arm Solenoid 1× Pneumatic valve for arm extension

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Take-Out Mechanism

4 top-level lines · 4 rows shown · 4 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Take-Out Arm glass-container-forming-machine-takeout-arm 1× 1 · part
2 Gripper Fingers glass-container-forming-machine-gripper-fingers 1× 1 · part
3 Discharge Conveyor glass-container-forming-machine-discharge-conveyor 1× 1 · part
4 Arm Solenoid glass-container-forming-machine-arm-solenoid 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the take-out mechanism is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks