Water Cooling System
AssemblyClosed-loop coolant circulation delivering water and emulsion to spindle wheel contact zones, maintaining tool life and surface quality. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Water Cooling System parts and their functions
6 top-level parts · 7 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Coolant Pump | 1× | Centrifugal pump, 50–100 L/min |
| 2 | Coolant Reservoir | 1× | Stainless steel tank, 200–500 L capacity |
| 3 | Coolant Filter | 1× | Magnetic and media filter assembly |
| 4 | Supply Manifold | 1× | Multi-port distribution header |
| 5 | Flow Meter | 1× | Rotameter or electronic flow sensor |
| 6 | Pressure Sensor | 2× | System pressure monitors |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Water Cooling System
6 top-level lines · 6 rows shown · 7 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Coolant Pump | coolant-pump | 1× | 1 | · | part |
| 2 | Coolant Reservoir | glass-edging-machine-coolant-reservoir | 1× | 1 | · | part |
| 3 | Coolant Filter | glass-edging-machine-coolant-filter | 1× | 1 | · | part |
| 4 | Supply Manifold | glass-edging-machine-supply-manifold | 1× | 1 | · | part |
| 5 | Flow Meter | glass-edging-machine-flow-meter | 1× | 1 | · | part |
| 6 | Pressure Sensor | pressure-sensor | 2× | 2 | · | part |
Where the water cooling system is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |