Machine Frame
AssemblyStructural base, columns and safety guarding. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Machine Frame parts and their functions
4 top-level parts · 8 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Base Frame | 1× | Welded steel base frame |
| 2 | Support Column | 2× | Support columns for the tilt table |
| 3 | Sheet Metal Panel | 4× | Guarding and casing panels |
| 4 | Safety Light Curtain | 1× | Safety light curtain at the operator side |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Machine Frame
4 top-level lines · 4 rows shown · 8 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Base Frame | gravity-die-casting-machine-base-frame | 1× | 1 | · | part |
| 2 | Support Column | gravity-die-casting-machine-column | 2× | 2 | · | part |
| 3 | Sheet Metal Panel | sheet-panel | 4× | 4 | · | part |
| 4 | Safety Light Curtain | gravity-die-casting-machine-light-curtain | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the machine frame is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
|
🇸🇬Beyonics
beyonics.com ↗
|
Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |