BOMwiki the bill-of-materials encyclopedia
30,441,950 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Cooling Water System

Assembly

Closed-loop deionised water circuit removing heat from coil and converter. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Cooling Water System parts and their functions

7 top-level parts · 12 parts in total · full bill of materials below
Cooling Water System parts diagram: 1 cooling pump, 2 plate heat exchanger, 3 cooling tower, 4 deioniser cartridge, 5 cooling flow switch, 6 pressure sensor, 7 expansion tank. 12 parts in 7 assemblies.
Cooling Water System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Cooling Pump Centrifugal circulation pumps (duty and standby)
2 Plate Heat Exchanger Plate heat exchanger to the secondary cooling water
3 Cooling Tower Evaporative cooling tower for secondary loop
4 Deioniser Cartridge Mixed-bed cartridge keeping water conductivity low
5 Cooling Flow Switch Flow switches interlocking the power supply
6 Pressure Sensor Pressure transmitters on coil supply and return
7 Expansion Tank Closed expansion tank for the primary loop

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Cooling Water System

7 top-level lines · 7 rows shown · 12 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Cooling Pump induction-melting-furnace-pump 2 · part
2 Plate Heat Exchanger induction-melting-furnace-heat-exchanger 1 · part
3 Cooling Tower induction-melting-furnace-cooling-tower 1 · part
4 Deioniser Cartridge induction-melting-furnace-deioniser 1 · part
5 Cooling Flow Switch induction-melting-furnace-flow-switch 4 · part
6 Pressure Sensor pressure-sensor 2 · part
7 Expansion Tank induction-melting-furnace-expansion-tank 1 · part

Where the cooling water system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks