BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Cooling System

Assembly

The spray headers, pump, and basin that cool the underside of each mold to solidify the ingot. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Cooling System parts and their functions

6 top-level parts · 139 parts in total · full bill of materials below
Cooling System parts diagram: 1 spray header, 2 spray nozzle, 3 cooling pump, 4 water basin, 5 control valve, 6 pressure sensor. 139 parts in 6 top-level items.
Cooling System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Spray Header 6× Underside spray headers
2 Spray Nozzle 120× Cooling spray nozzles
3 Cooling Pump 2× Recirculation pumps
4 Water Basin 1× Collection basin
5 Control Valve 6× Header control valves
6 Pressure Sensor 4× Header pressure sensors

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Cooling System

6 top-level lines · 6 rows shown · 139 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Spray Header ingot-casting-machine-spray-header 6× 6 · part
2 Spray Nozzle ingot-casting-machine-spray-nozzle 120× 120 · part
3 Cooling Pump ingot-casting-machine-cooling-pump 2× 2 · part
4 Water Basin ingot-casting-machine-water-basin 1× 1 · part
5 Control Valve ingot-casting-machine-control-valve 6× 6 · part
6 Pressure Sensor pressure-sensor 4× 4 · part

Something wrong in this list? Report a problem with this BOM.

Where the cooling system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks