Electrode System

Assembly

Three graphite electrodes and their regulators that strike arcs to heat the steel. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Electrode System parts and their functions

6 top-level parts · 18 parts in total · full bill of materials below
Electrode System parts diagram: 1 graphite electrode, 2 electrode arm, 3 electrode clamp, 4 lifting mast, 5 regulator cylinder, 6 bus tube. 18 parts in 6 assemblies.
Electrode System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Graphite Electrode Graphite electrodes
2 Electrode Arm Electrode arms
3 Electrode Clamp Electrode clamps
4 Lifting Mast Lifting masts
5 Regulator Cylinder Regulator cylinders
6 Bus Tube Water-cooled bus tubes

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Electrode System

6 top-level lines · 6 rows shown · 18 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Graphite Electrode ladle-refining-furnace-graphite-electrode 3 · part
2 Electrode Arm ladle-refining-furnace-electrode-arm 3 · part
3 Electrode Clamp ladle-refining-furnace-electrode-clamp 3 · part
4 Lifting Mast ladle-refining-furnace-mast 3 · part
5 Regulator Cylinder ladle-refining-furnace-regulator-cylinder 3 · part
6 Bus Tube ladle-refining-furnace-bus-tube 3 · part

Where the electrode system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks