BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Leak Test Instrument

Assembly

The controller that runs the fill-stabilize-test-exhaust sequence, reads the sensors, and decides pass or fail against the set leak limit. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Leak Test Instrument parts and their functions

5 top-level parts · 304 parts in total · full bill of materials below
Leak Test Instrument parts diagram: 1 instrument main board, 2 signal conditioning board, 3 instrument display, 4 power supply, 5 I/O terminal block. 304 parts in 5 top-level items.
Leak Test Instrument parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Instrument Main Board 5 parts 1× Instrument main board
2 Signal Conditioning Board 3 parts 1× Signal conditioning board
3 Instrument Display 1× Instrument display
4 Power Supply 1× Instrument power supply
5 I/O Terminal Block 1× I/O terminal block

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Leak Test Instrument

5 top-level lines · 13 rows shown · 304 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Instrument Main Board 5 parts leak-testing-machine-instrument-board 1× 1 174 assembly
1.1 Bare PCB pcb-bare 1× 1 · part
1.2 Microcontroller mcu 1× 1 · part
1.3 SMD Passive (R/C/L) smd-passives 160× 160 · part
1.4 Connector connector 8× 8 · part
1.5 Relay relay 4× 4 · part
2 Signal Conditioning Board 3 parts leak-testing-machine-signal-board 1× 1 127 assembly
2.1 Bare PCB pcb-bare 1× 1 · part
2.2 SMD Passive (R/C/L) smd-passives 120× 120 · part
2.3 Connector connector 6× 6 · part
3 Instrument Display leak-testing-machine-instrument-display 1× 1 · part
4 Power Supply power-supply 1× 1 · part
5 I/O Terminal Block leak-testing-machine-io-terminal 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the leak test instrument is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks