BOMwiki the bill-of-materials encyclopedia
30,441,950 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

A/B Metering and Mixing System

Assembly

Twin drum pumps meter compounds A and B at 1:1 ratio through a static mixer into the barrel. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

A/B Metering and Mixing System parts and their functions

6 top-level parts · 18 parts in total · full bill of materials below
A/B Metering and Mixing System parts diagram: 1 drum follower pump, 2 A/B metering block, 3 pigment dosing pump, 4 static mixer element, 5 degassing block, 6 pressure sensor. 18 parts in 6 assemblies.
A/B Metering and Mixing System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Drum Follower Pump 4 parts Follower-plate ram pumps for 200 L drums
2 A/B Metering Block Servo-driven 1:1 metering block
3 Pigment Dosing Pump Optional pigment dosing pump
4 Static Mixer Element Disposable in-line mixing element
5 Degassing Block Vacuum degas chamber
6 Pressure Sensor Line pressure monitoring

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for A/B Metering and Mixing System

6 top-level lines · 10 rows shown · 18 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Drum Follower Pump 4 parts lsr-drum-pump 2 6 assembly
1.1 Follower Plate lsr-follower-plate 2 · part
1.2 Ram Cylinder lsr-ram-cylinder 2 · part
1.3 Piston Transfer Pump lsr-piston-pump 2 · part
1.4 O-Ring Set oring-set 6 · part
2 A/B Metering Block lsr-metering-pump 1 · part
3 Pigment Dosing Pump lsr-color-pump 1 · part
4 Static Mixer Element lsr-static-mixer 1 · part
5 Degassing Block lsr-degassing-block 1 · part
6 Pressure Sensor pressure-sensor 2 · part

Where the A/B metering and mixing system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks