BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Base Frame Assembly

Assembly

Welded mild steel structural frame (rectangular, 1200 × 1000 mm footprint) with reinforced lifting arm pivot points and bumpers. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Base Frame Assembly parts and their functions

4 top-level parts · 6 parts in total · full bill of materials below
Base Frame Assembly parts diagram: 1 main chassis frame, 2 arm pivot mounting plate, 3 protective bumper strip, 4 hose routing tubing. 6 parts in 4 top-level items.
Base Frame Assembly parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Main Chassis Frame 1× Structural steel channel and box-section welding forming main chassis
2 Arm Pivot Mounting Plate 2× Reinforced steel plate at arm pivot, drilled for hinge pins
3 Protective Bumper Strip 2× Rubber or foam-padded edge strips preventing wall collision damage
4 Hose Routing Tubing 1× Internal tubing and routing channels for hydraulic hose management

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Base Frame Assembly

4 top-level lines · 4 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Main Chassis Frame mortuary-body-lift-base-channel 1× 1 · part
2 Arm Pivot Mounting Plate mortuary-body-lift-pivot-plate 2× 2 · part
3 Protective Bumper Strip mortuary-body-lift-bumper-rail 2× 2 · part
4 Hose Routing Tubing mortuary-body-lift-cable-routing 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the base frame assembly is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks