Picking Cabin Workstation
AssemblyErgonomic operator station with moving belt and bin interface for manual secondary sorting. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Picking Cabin Workstation parts and their functions
5 top-level parts · 9 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Cabin Structure | 1× | Stainless-steel cabin structure, ergonomic layout |
| 2 | Cabin Belt Motor | 1× | 1.5 kW AC motor driving cabin sorting belt |
| 3 | Cabin Belt | 1× | Nylon belt, 0.6 m wide, variable speed 0.1–0.5 m/s |
| 4 | Bin Holder | 4× | Swing-out bin holders for material collection |
| 5 | Work Light | 2× | LED work lights, 500 lux minimum illumination |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Picking Cabin Workstation
5 top-level lines · 5 rows shown · 9 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Cabin Structure | mrf-sorting-line-cabin-frame | 1× | 1 | · | part |
| 2 | Cabin Belt Motor | mrf-sorting-line-cabin-belt-motor | 1× | 1 | · | part |
| 3 | Cabin Belt | mrf-sorting-line-cabin-belt | 1× | 1 | · | part |
| 4 | Bin Holder | mrf-sorting-line-cabin-bin-support | 4× | 4 | · | part |
| 5 | Work Light | mrf-sorting-line-cabin-light | 2× | 2 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the picking cabin workstation is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |