BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Effluent Polishing

Assembly

Tertiary filtration and nutrient removal stage achieving <10 mg/L suspended solids and reduced N/P. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Effluent Polishing parts and their functions

4 top-level parts · 4 parts in total · full bill of materials below
Effluent Polishing parts diagram: 1 sand filter, 2 backwash pump, 3 pressure sensor, 4 effluent valve. 4 parts in 4 top-level items.
Effluent Polishing parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Sand Filter 1× Granular media bed for fine solids capture
2 Backwash Pump 1× Cleaning flow reversal (2–5 m³/min)
3 Pressure Sensor 1× Filter differential pressure indication and alarm
4 Effluent Valve 1× Filtrate diversion and discharge control

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Effluent Polishing

4 top-level lines · 4 rows shown · 4 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Sand Filter package-wastewater-plant-sand-filter 1× 1 · part
2 Backwash Pump package-wastewater-plant-backwash-pump 1× 1 · part
3 Pressure Sensor pressure-sensor 1× 1 · part
4 Effluent Valve package-wastewater-plant-effluent-valve 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the effluent polishing is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks