Pearl Holding Clamp
AssemblyPneumatic or manual vice with V-block or custom-shaped jaws securing pearl without crushing. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Pearl Holding Clamp parts and their functions
5 top-level parts · 6 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Clamp Housing | 1× | Ductile iron or aluminum housing 3 × 3 × 2 inches |
| 2 | Clamp Jaw | 2× | Rubber-lined or leather-faced jaws gripping pearl |
| 3 | Clamp Pneumatic Piston | 1× | Pneumatic cylinder providing clamping force |
| 4 | Clamp Solenoid Valve | 1× | Solenoid valve controlling clamp opening and closing |
| 5 | Pearl Centering Pin | 1× | Alignment pin ensuring pearl centering below spindle |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Pearl Holding Clamp
5 top-level lines · 5 rows shown · 6 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Clamp Housing | pearl-drilling-machine-clamp-body | 1× | 1 | · | part |
| 2 | Clamp Jaw | pearl-drilling-machine-clamp-jaw-pair | 2× | 2 | · | part |
| 3 | Clamp Pneumatic Piston | pearl-drilling-machine-clamp-piston | 1× | 1 | · | part |
| 4 | Clamp Solenoid Valve | pearl-drilling-machine-clamp-air-valve | 1× | 1 | · | part |
| 5 | Pearl Centering Pin | pearl-drilling-machine-clamp-guide-pin | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the pearl holding clamp is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |