Post-Mold Cooling Robot Arm
AssemblyMulti-axis robot arm with spray cooling nozzle and gripper rapidly cooling preforms in the mold before ejection. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Post-Mold Cooling Robot Arm parts and their functions
5 top-level parts · 7 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Robot Arm | 1× | 6-axis articulated robot 20–50 kg payload |
| 2 | Cooling Spray Nozzle | 1× | Water/air spray cooling head |
| 3 | Robot Gripper | 1× | Vacuum or mechanical gripper |
| 4 | Robot Controller | 1× | Robot motion controller |
| 5 | Encoder | 3× | Joint position feedback on key axes |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Post-Mold Cooling Robot Arm
5 top-level lines · 5 rows shown · 7 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Robot Arm | pet-preform-injection-robot-arm | 1× | 1 | · | part |
| 2 | Cooling Spray Nozzle | pet-preform-injection-spray-nozzle | 1× | 1 | · | part |
| 3 | Robot Gripper | pet-preform-injection-gripper | 1× | 1 | · | part |
| 4 | Robot Controller | pet-preform-injection-controller-robot | 1× | 1 | · | part |
| 5 | Encoder | encoder | 3× | 3 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the post-mold cooling robot arm is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |