Air Ring
AssemblyBlows a uniform curtain of cooling air around the emerging tube to set the frost line and freeze the film. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Air Ring parts and their functions
4 top-level parts · 8 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Air Ring Body | 1× | Dual-lip ring body |
| 2 | Air Lip | 2× | Adjustable air lips |
| 3 | Air Plenum | 1× | Distribution plenum |
| 4 | Air Hose | 4× | Supply hoses |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Air Ring
4 top-level lines · 4 rows shown · 8 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Air Ring Body | pfbm-air-ring-body | 1× | 1 | · | part |
| 2 | Air Lip | pfbm-air-ring-lip | 2× | 2 | · | part |
| 3 | Air Plenum | pfbm-air-plenum | 1× | 1 | · | part |
| 4 | Air Hose | pfbm-air-hose | 4× | 4 | · | part |
Where the air ring is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |