BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items

You are viewing r124939 of this page, not the current version. Go to current · history

Coil Preparation Unit

Assembly

Loads the coil to the mandrel, breaks the outer lap free and feeds the strip head into the welder. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Bill of materials for Coil Preparation Unit

3 top-level lines as of r124939
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Coil Loading Car pickling-line-coil-car 1× 1 · part
2 Peeler Unit pickling-line-peeler 1× 1 · part
3 Preparation Pinch Roll pickling-line-prep-pinch-roll 1× 1 · part