BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items

You are viewing r131570 of this page, not the current version. Go to current · history

Pretreatment Tunnel

Assembly

Multi-stage spray washer that cleans and conversion-coats parts before painting. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Bill of materials for Pretreatment Tunnel

9 top-level lines as of r131570
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Wash Tunnel Enclosure powder-coating-line-wash-tunnel 1× 1 · part
2 Wash Stage 3 parts powder-coating-line-wash-stage 5× 5 0 assembly
3 Spray Nozzle powder-coating-line-spray-nozzle 180× 180 · part
4 Spray Riser powder-coating-line-spray-riser 24× 24 · part
5 Stage Tank powder-coating-line-stage-tank 5× 5 · part
6 Stage Pump 7 parts powder-coating-line-stage-pump 5× 5 0 assembly
7 Immersion Heater 3 parts powder-coating-line-immersion-heater 4× 4 0 assembly
8 Chemical Dosing Pump powder-coating-line-dosing-pump 4× 4 · part
9 Pressure Sensor pressure-sensor 5× 5 · part