BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Fiber Creel

Assembly

Carousel holding multiple roving and mat spools, delivering continuous fiber bundles to the resin bath at controlled tension. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Fiber Creel parts and their functions

5 top-level parts · 21 parts in total · full bill of materials below
Fiber Creel parts diagram: 1 creel frame, 2 spool holder assembly, 3 fiber guide, 4 mat support rail, 5 tension compensator. 21 parts in 5 top-level items.
Fiber Creel parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Creel Frame 1× Multi-level structure
2 Spool Holder Assembly 8× Individual spool bearings
3 Fiber Guide 6× Diverging fibers into bath
4 Mat Support Rail 2× Continuous mat positioning
5 Tension Compensator 4× Mechanical tensioning

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Fiber Creel

5 top-level lines · 5 rows shown · 21 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Creel Frame pultrusion-machine-creel-frame 1× 1 · part
2 Spool Holder Assembly pultrusion-machine-spool-holder 8× 8 · part
3 Fiber Guide pultrusion-machine-fiber-guide 6× 6 · part
4 Mat Support Rail pultrusion-machine-mat-support 2× 2 · part
5 Tension Compensator pultrusion-machine-tension-compensator 4× 4 · part

Something wrong in this list? Report a problem with this BOM.

Where the fiber creel is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks