Wire Tier Assembly
AssemblyMotorized baling wire dispenser and tier that wraps and cuts wire after each bale ejection. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Wire Tier Assembly parts and their functions
5 top-level parts · 6 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Wire Spool Drive Motor | 1× | 1.5 kW AC motor, gear reduction 50:1 |
| 2 | Wire Knotter | 1× | Pneumatic-operated needle threader |
| 3 | Wire Cutter | 1× | Guillotine cutter, solenoid-actuated |
| 4 | Wire Guide Eyelet | 2× | Hard-chrome eyelets for wire routing |
| 5 | Drive Belt | 1× | V-belt for motor to knotter drive shaft |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Wire Tier Assembly
5 top-level lines · 5 rows shown · 6 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Wire Spool Drive Motor | recycling-baler-wire-spool-motor | 1× | 1 | · | part |
| 2 | Wire Knotter | recycling-baler-wire-knotter | 1× | 1 | · | part |
| 3 | Wire Cutter | recycling-baler-wire-cutter | 1× | 1 | · | part |
| 4 | Wire Guide Eyelet | recycling-baler-wire-guide | 2× | 2 | · | part |
| 5 | Drive Belt | drive-belt | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the wire tier assembly is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.10–$30. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| motherson.com ↗ | Noida, IN | Wiring harness & modules | 1,000 sets | 4–6 wks |
|
🇮🇳Polycab
polycab.com ↗
|
Mumbai, IN | Wires & cables | 1,000 sets | 4–6 wks |
|
🇨🇳Luxshare
luxshare-ict.com ↗
|
Dongguan, CN | Connectors & cables | 1,000 sets | 4–6 wks |
|
🇨🇳Hengtong
hengtonggroup.com ↗
|
Suzhou, CN | Cables | 1,000 sets | 4–6 wks |
|
🇮🇳Finolex
finolex.com ↗
|
Pune, IN | Wires & cables | 1,000 sets | 4–6 wks |