BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Control & Sequencing

Assembly

PLC managing injection timing, pump displacement ratio, vacuum dwell, and mold release sequence. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Control & Sequencing parts and their functions

5 top-level parts · 5 parts in total · full bill of materials below
Control & Sequencing parts diagram: 1 RTM controller, 2 HMI panel, 3 pressure control, 4 timer module, 5 e-stop system. 5 parts in 5 top-level items.
Control & Sequencing parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 RTM Controller 1× Programmable logic controller
2 HMI Panel 1× Operator interface
3 Pressure Control 1× Pump speed and pressure regulation
4 Timer Module 1× Sequence timing
5 E-Stop System 1× Safety circuit

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Control & Sequencing

5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 RTM Controller resin-transfer-molding-machine-plc 1× 1 · part
2 HMI Panel resin-transfer-molding-machine-hmi 1× 1 · part
3 Pressure Control resin-transfer-molding-machine-pressure-controller 1× 1 · part
4 Timer Module resin-transfer-molding-machine-timer-relay 1× 1 · part
5 E-Stop System resin-transfer-molding-machine-emergency-stop 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the control & sequencing is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks