BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Top Cover

Assembly

Hinged dust cover with charge ports. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Top Cover parts and their functions

6 top-level parts · 9 parts in total · full bill of materials below
Top Cover parts diagram: 1 cover panel, 2 material feed port, 3 vent dust filter, 4 safety grate, 5 cover hinge, 6 cover interlock switch. 9 parts in 6 top-level items.
Top Cover parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Cover Panel 1×
2 Material Feed Port 2×
3 Vent Dust Filter 1× Dust collection vent
4 Safety Grate 2×
5 Cover Hinge 2×
6 Cover Interlock Switch 1× Interlock

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Top Cover

6 top-level lines · 6 rows shown · 9 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Cover Panel ribbon-blender-food-cover-panel 1× 1 · part
2 Material Feed Port ribbon-blender-food-feed-port 2× 2 · part
3 Vent Dust Filter ribbon-blender-food-vent-filter 1× 1 · part
4 Safety Grate ribbon-blender-food-safety-grate 2× 2 · part
5 Cover Hinge ribbon-blender-food-cover-hinge 2× 2 · part
6 Cover Interlock Switch ribbon-blender-food-cover-switch 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the top cover is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks