BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Gauge and Trim

Assembly

Thickness gauge and edge trim closing the loop on sheet quality. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Gauge and Trim parts and their functions

6 top-level parts · 7 parts in total · full bill of materials below
Gauge and Trim parts diagram: 1 thickness gauge, 2 gauge o-frame, 3 edge trim knife, 4 trim take-up, 5 profile controller, 6 connector. 7 parts in 6 top-level items.
Gauge and Trim parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Thickness Gauge 1× Traversing thickness gauge
2 Gauge O-Frame 1× O-frame carrying the gauge head
3 Edge Trim Knife 2× Edge trim knives
4 Trim Take-Up 1× Edge scrap take-up
5 Profile Controller 1× Cross-web profile controller
6 Connector 1× Gauge signal connector

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Gauge and Trim

6 top-level lines · 6 rows shown · 7 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Thickness Gauge rubber-calender-beta-gauge 1× 1 · part
2 Gauge O-Frame rubber-calender-gauge-frame 1× 1 · part
3 Edge Trim Knife rubber-calender-edge-trim 2× 2 · part
4 Trim Take-Up rubber-calender-trim-winder 1× 1 · part
5 Profile Controller rubber-calender-profile-controller 1× 1 · part
6 Connector connector 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the gauge and trim is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks