BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Roll Stack

Assembly

Three or four heavy chilled-iron rolls in an I, L or Z arrangement. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Roll Stack parts and their functions

7 top-level parts · 28 parts in total · full bill of materials below
Roll Stack parts diagram: 1 calender roll, 2 roll neck bearing, 3 roll journal, 4 roll drilling, 5 doctor blade, 6 stock side guide, 7 roll rotary joint. 28 parts in 7 top-level items.
Roll Stack parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Calender Roll 4× Chilled-iron calender rolls
2 Roll Neck Bearing 8× Spherical roller roll-neck bearings
3 Roll Journal 4× Ground roll necks carrying the bearings
4 Roll Drilling 4× Peripheral drilling for temperature media
5 Doctor Blade 2× Doctor blades clearing the roll faces
6 Stock Side Guide 2× Side guides containing the bank
7 Roll Rotary Joint 4× Rotary joints for steam and water

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Roll Stack

7 top-level lines · 7 rows shown · 28 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Calender Roll rubber-calender-roll 4× 4 · part
2 Roll Neck Bearing rubber-calender-roll-bearing 8× 8 · part
3 Roll Journal rubber-calender-roll-journal 4× 4 · part
4 Roll Drilling rubber-calender-roll-jacket 4× 4 · part
5 Doctor Blade rubber-calender-doctor-blade 2× 2 · part
6 Stock Side Guide rubber-calender-stock-guide 2× 2 · part
7 Roll Rotary Joint rubber-calender-rotary-joint 4× 4 · part

Something wrong in this list? Report a problem with this BOM.

Where the roll stack is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks