BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Filtrate Collection Trays

Assembly

Multi-zone drainage galleries (inlet, middle, discharge zones) returning filtrate to process. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Filtrate Collection Trays parts and their functions

4 top-level parts · 4 parts in total · full bill of materials below
Filtrate Collection Trays parts diagram: 1 inlet tray, 2 middle tray, 3 discharge tray, 4 sump basin. 4 parts in 4 top-level items.
Filtrate Collection Trays parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Inlet Tray 1× Initial drainage from screen inlet
2 Middle Tray 1× Intermediate drainage gallery
3 Discharge Tray 1× Final drainage at conical section
4 Sump Basin 1× Common collection and pump-out point

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Filtrate Collection Trays

4 top-level lines · 4 rows shown · 4 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Inlet Tray sludge-screw-press-inlet-tray 1× 1 · part
2 Middle Tray sludge-screw-press-middle-tray 1× 1 · part
3 Discharge Tray sludge-screw-press-discharge-tray 1× 1 · part
4 Sump Basin sludge-screw-press-sump-basin 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the filtrate collection trays is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks