Grips and Fixtures
AssemblyThe jaws and adapters that hold the specimen and transfer load into it without slipping or inducing bending. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Grips and Fixtures parts and their functions
5 top-level parts · 11 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Wedge Grip Body | 2× | Wedge grip bodies |
| 2 | Serrated Jaw Insert | 4× | Serrated jaw inserts |
| 3 | Grip Adapter | 2× | Grip adapters |
| 4 | Load-String Coupling | 2× | Load-string couplings |
| 5 | Fastener Set | 1× | Grip fasteners |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Grips and Fixtures
5 top-level lines · 5 rows shown · 11 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Wedge Grip Body | tensile-testing-machine-wedge-grip | 2× | 2 | · | part |
| 2 | Serrated Jaw Insert | tensile-testing-machine-jaw-insert | 4× | 4 | · | part |
| 3 | Grip Adapter | tensile-testing-machine-grip-adapter | 2× | 2 | · | part |
| 4 | Load-String Coupling | tensile-testing-machine-coupling | 2× | 2 | · | part |
| 5 | Fastener Set | fastener-set | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the grips and fixtures is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |