BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Gas and Fuel Console

Assembly

The console that meters the primary plasma gas, the secondary gas, and the carrier gas through mass-flow controllers. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Gas and Fuel Console parts and their functions

9 top-level parts · 26 parts in total · full bill of materials below
Gas and Fuel Console parts diagram: 1 argon mass-flow controller, 2 hydrogen mass-flow controller, 3 nitrogen mass-flow controller, 4 carrier mass-flow controller, 5 gas manifold, 6 solenoid valve bank, 7 flashback arrestor, 8 pressure sensor, 9 fastener set. 26 parts in 9 top-level items.
Gas and Fuel Console parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Argon Mass-Flow Controller 1× Argon primary mass-flow controller
2 Hydrogen Mass-Flow Controller 1× Hydrogen secondary mass-flow controller
3 Nitrogen Mass-Flow Controller 1× Nitrogen secondary mass-flow controller
4 Carrier Mass-Flow Controller 1× Carrier gas mass-flow controller
5 Gas Manifold 1× Stainless gas manifold
6 Solenoid Valve Bank 3 parts 1× Process solenoid valve bank
7 Flashback Arrestor 2× Flashback arrestor
8 Pressure Sensor 4× Supply line pressure sensors
9 Fastener Set 1× Bolts, nuts, and washers.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Gas and Fuel Console

9 top-level lines · 12 rows shown · 26 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Argon Mass-Flow Controller thermal-spray-machine-argon-mfc 1× 1 · part
2 Hydrogen Mass-Flow Controller thermal-spray-machine-hydrogen-mfc 1× 1 · part
3 Nitrogen Mass-Flow Controller thermal-spray-machine-nitrogen-mfc 1× 1 · part
4 Carrier Mass-Flow Controller thermal-spray-machine-carrier-mfc 1× 1 · part
5 Gas Manifold thermal-spray-machine-gas-manifold 1× 1 · part
6 Solenoid Valve Bank 3 parts thermal-spray-machine-solenoid-bank 1× 1 14 assembly
6.1 Gas Solenoid Valve thermal-spray-machine-gas-solenoid 5× 5 · part
6.2 Connector connector 8× 8 · part
6.3 Fastener Set fastener-set 1× 1 · part
7 Flashback Arrestor thermal-spray-machine-flashback-arrestor 2× 2 · part
8 Pressure Sensor pressure-sensor 4× 4 · part
9 Fastener Set fastener-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the gas and fuel console is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks