BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Feedstock Preparation

Assembly

Tire shredding and continuous-feed screw delivering material to reactor. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Feedstock Preparation parts and their functions

5 top-level parts · 5 parts in total · full bill of materials below
Feedstock Preparation parts diagram: 1 tire shredder, 2 feed hopper, 3 feed screw, 4 feed motor, 5 inlet check valve. 5 parts in 5 top-level items.
Feedstock Preparation parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Tire Shredder 1× 15 kW shredder reducing tires to <50 mm chips
2 Feed Hopper 1× 2 m³ capacity surge hopper with level switch
3 Feed Screw 1× Auger screw meter feeding material at 100–150 kg/h
4 Feed Motor 1× 3 kW variable-speed AC motor
5 Inlet Check Valve 1× Pneumatic isolation valve preventing backflow

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Feedstock Preparation

5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Tire Shredder tire-pyrolysis-plant-tire-shredder 1× 1 · part
2 Feed Hopper tire-pyrolysis-plant-feed-hopper 1× 1 · part
3 Feed Screw tire-pyrolysis-plant-feed-screw 1× 1 · part
4 Feed Motor tire-pyrolysis-plant-feed-motor 1× 1 · part
5 Inlet Check Valve tire-pyrolysis-plant-reactor-inlet-valve 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the feedstock preparation is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks