BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Envelope Oven

Assembly

Pre-cure heating chamber raising tire temperature to curing baseline. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Envelope Oven parts and their functions

4 top-level parts · 4 parts in total · full bill of materials below
Envelope Oven parts diagram: 1 envelope chamber, 2 envelope heater, 3 envelope conveyor, 4 envelope temp control. 4 parts in 4 top-level items.
Envelope Oven parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Envelope Chamber 1× Insulated heating box
2 Envelope Heater 1× 20–30 kW infrared or element heater
3 Envelope Conveyor 1× Rolling or belt feed through oven
4 Envelope Temp Control 1× PID thermostat

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Envelope Oven

4 top-level lines · 4 rows shown · 4 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Envelope Chamber tire-retreading-machine-envelope-chamber 1× 1 · part
2 Envelope Heater tire-retreading-machine-envelope-heater 1× 1 · part
3 Envelope Conveyor tire-retreading-machine-envelope-conveyor 1× 1 · part
4 Envelope Temp Control tire-retreading-machine-envelope-temperature-control 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the envelope oven is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks