BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Cooling Line

Assembly

The take-away conveyor, spray cooling, and shrink correction that cool the extruded tread and hold its length. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Cooling Line parts and their functions

5 top-level parts · 9 parts in total · full bill of materials below
Cooling Line parts diagram: 1 shrinkage conveyor, 2 cooling bath, 3 spray bar, 4 thickness gauge, 5 drive belt. 9 parts in 5 top-level items.
Cooling Line parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Shrinkage Conveyor 1× Shrinkage conveyor
2 Cooling Bath 1× Water cooling bath
3 Spray Bar 4× Spray bars
4 Thickness Gauge 1× Thickness gauge
5 Drive Belt 2× Conveyor belts

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Cooling Line

5 top-level lines · 5 rows shown · 9 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Shrinkage Conveyor tire-tread-extruder-shrink-conveyor 1× 1 · part
2 Cooling Bath tire-tread-extruder-cooling-bath 1× 1 · part
3 Spray Bar tire-tread-extruder-spray-bar 4× 4 · part
4 Thickness Gauge tire-tread-extruder-beta-gauge 1× 1 · part
5 Drive Belt drive-belt 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the cooling line is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks